Apply

Ready to go for it?

AI Apply speeds things up—apply directly if you prefer.

FREE ACCESS
5,000–10,000 jobs/day
Scoutfield Logo

See all jobs on Scoutfield

Search thousands of fresh jobs every day.

Discover
  • Fresh listings
  • Fast filters
  • No subscription required
Create a free account and start exploring right away.
Salute

Data Center Construction Security Officer

Salute

. Conduct unarmed interior and/or exterior foot and vehicle patrols .

Posted 10/14/2026full-timeAbilene • Texas • United StatesMid-LevelSenior💰 $20 per hourWebsite

Core Competencies

Role fit
Core Competencies

Use this summary to align your resume positioning with the role.

Demonstrates strong security awareness and the ability to manage access control effectively while maintaining safety protocols. Possesses excellent customer service skills and the physical capability to respond to emergencies in various environments.

Highest-signal resume keywords
Texas DPS Guard CardCustomer Service ExperienceAccess Control ManagementSurveillance MonitoringPhysical Fitness

ATS Keywords

Tailor your resume
Applicant Tracking System Keywords

Tip: use these terms in your resume and cover letter to boost ATS matches.

Hard Skills
Patrol ConductAccess Log MaintenanceTraffic ControlAlarm System MonitoringEmergency ResponseEquipment LiftingClimbing LaddersKneeling and BendingColor DifferentiationHand-Eye Coordination
Soft Skills
Team PlayerHelpful DispositionCommunication Skills
Tools & Technologies
Surveillance CamerasAlarm SystemsComputer Systems
Certifications & Qualifications
High School Diploma or EquivalentValid Driver’s License
Industry Keywords
Security PoliciesAccess ControlSafety HazardsSuspicious Activity ReportingProperty Removal Compliance

About the role

Key responsibilities & impact
  • Conduct unarmed interior and/or exterior foot and vehicle patrols
  • Patrol exterior facility grounds
  • Control access and egress at gates
  • Ensure only authorized personnel enter the property
  • Manage traffic flow at gates
  • Maintain access logs
  • Monitor cameras and alarm systems after normal working hours
  • Notify the Shift Lead or Supervisor of issues
  • Observe and report suspicious activity
  • Maintain awareness of security concerns and safety hazards
  • Observe departing personnel to protect against theft of company property
  • Ensure authorized property removal complies with client requirements
  • Communicate security policies and issues
  • Warn violators of rule infractions
  • Monitor entrances and exits
  • Control and direct traffic

Requirements

What you’ll need
  • Customer service experience
  • A team player with a helpful disposition
  • Excellent computer skills
  • High School Diploma or equivalent
  • Able to pass a background check and 10-panel drug screen
  • Texas DPS Guard Card
  • Ability to lift and carry heavy equipment up to 40 lbs.
  • Ability to climb ladders and multiple flights of stairs
  • Ability to stand for long periods
  • Ability to bend, stoop, kneel, and reach
  • Basic physical fitness to respond quickly to emergencies
  • Ability to move quickly and efficiently in various work environments
  • Good hand-eye coordination and dexterity
  • Clear vision, with or without correction, while wearing safety glasses
  • Ability to differentiate color-coded warning signs, labels, and cables
  • Ability to work across a wide range of indoor temperatures
  • Ability to work outdoors in various weather conditions
  • Ability to work in elevated noise levels while wearing hearing protection
  • Valid driver’s license for work-related travel, as required

Benefits

Comp & perks
  • 8 company-paid holidays
  • 2 floating holidays
  • PTO
  • Medical, dental, and vision insurance
  • Employee Assistance Program
  • Employer-supported 401(k) with immediate 100% vesting
  • 3% employer match and a 50% match on the next 2%
  • HSA
  • Mental health resources
  • Gym discounts
  • Discounted legal services
  • Home and auto insurance
  • Pet insurance
  • ID theft protection
  • Discounted Group Life & AD&D
  • Discounted Group Short & Long-term Disability
  • Parental leave