Apply

Ready to go for it?

AI Apply speeds things up—apply directly if you prefer.

FREE ACCESS
5,000–10,000 jobs/day
Scoutfield Logo

See all jobs on Scoutfield

Search thousands of fresh jobs every day.

Discover
  • Fresh listings
  • Fast filters
  • No subscription required
Create a free account and start exploring right away.
Turner & Townsend

Senior Cost Manager – Data Center Construction

Turner & Townsend

. Provide an independent cost view on data center deals from intake through lease execution .

Posted 11/11/2026full-timeRemote • United StatesSeniorWebsite

Core Competencies

Role fit
Core Competencies

Use this summary to align your resume positioning with the role.

Demonstrates expertise in cost management for construction projects, particularly in data center environments, with strong capabilities in budget estimation, procurement processes, and risk exposure analysis. Proficient in utilizing advanced tools for cost forecasting and reporting while ensuring compliance with industry standards.

Highest-signal resume keywords
Cost ManagementBudget EstimationAdvanced Excel ProficiencyPower BIConstruction Consultancy Experience

ATS Keywords

Tailor your resume
Applicant Tracking System Keywords

Tip: use these terms in your resume and cover letter to boost ATS matches.

Hard Skills
Cost ManagementBudget EstimationRisk Exposure AnalysisValue EngineeringValue ManagementProcurement RoutesCost Reporting FormatsQA/QCCost ForecastingConstruction Industry Technical Knowledge
Soft Skills
Excellent Communication Skills
Tools & Technologies
Power BICost Management ToolsForecasting Tools
Certifications & Qualifications
RICSAACE
Industry Keywords
Data Center ConstructionMission-Critical ConstructionOwner-Side ExperienceConsultancy ExperienceConstruction Management

About the role

Key responsibilities & impact
  • Provide an independent cost view on data center deals from intake through lease execution
  • Produce high-level dollars-per-megawatt budgets and rough-order-of-magnitude estimates
  • Join deal calls, take notes and provide cost-review context to the Pre-Lease Senior Program Manager
  • Set up and validate CRA exhibits and pre-approve Expense Item Requests
  • Review CRA and EIR claims against supporting documentation within three business days
  • Review developer preliminary budgets and owner-furnished versus lease-scope splits
  • Conduct budget challenge rounds and workshops with developer cost teams
  • Issue cost narratives covering caps, cash flow and termination exposure
  • Contribute cost grades and entries to the Risk Exposure Log within 24 hours
  • Confirm the cost position at lease and hand it over to Delivery
  • Review general-contractor procurement and delivery models
  • Flag ROM-to-GMP drift and maintain cash-flow look-ahead
  • Build portfolio cost-forecast model inputs and hand over open items
  • Report weekly CRA status and provide auditable backup to the client’s finance team
  • Tag deals to WBS Level 3 benchmarks and $/critical MW entries
  • Own global cost benchmarking across the portfolio
  • Maintain cost templates and the one-record standard
  • Perform QA/QC and cover colleagues’ deals
  • Manage approximately six pre-lease deals alongside Pre-Lease Senior Program Managers
  • Operate within the pre-lease scope boundary without negotiating or providing legal, commercial or deal-making advice
  • Adhere to SOX control responsibilities where applicable

Requirements

What you’ll need
  • Bachelor’s degree in construction management, cost management, quantity surveying, engineering or a field related to construction
  • Minimum 5–7 years of relevant experience in a construction-industry cost management role
  • Experience leading cost management on medium or large, medium- to high-complexity construction projects
  • Construction consultancy experience strongly preferred
  • Good knowledge of construction industry technical matters, including procurement routes, value management and value engineering
  • Excellent communication skills
  • Advanced Excel proficiency
  • Power BI or equivalent, cost management and forecasting tools
  • Experience with developer budget and cost-report formats
  • RICS, AACE or equivalent certification preferred
  • RICS accreditation or progress toward it preferred
  • Data center and mission-critical construction cost management experience
  • Owner-side or consultancy experience
  • Ability to work from a regional hub in Northern Virginia, Dallas, San Francisco or Canada, with visits to developer sites as needed

Benefits

Comp & perks
  • Healthy, productive and flexible working environment
  • Work-life balance support
  • Equal opportunity and inclusive workplace
  • Confidential handling of information according to EEO guidelines