FREE ACCESS
5,000–10,000 jobs/day
See all jobs on Scoutfield
Search thousands of fresh jobs every day.
Discover
- Fresh listings
- Fast filters
- No subscription required
Create a free account and start exploring right away.

Senior Electrical Cost Estimator – Data Center Construction
Turner & Townsend. Develop conceptual, schematic, design development, and detailed electrical cost estimates and cost plans .
Posted 10/14/2026full-timeRemote • California • United StatesSenior💰 $100,000 - $170,000 per yearWebsite
Core Competencies
Role fitCore Competencies
Use this summary to align your resume positioning with the role.
Demonstrates extensive electrical estimating experience for data centers and large-scale commercial projects, with strong capabilities in cost management, procurement strategies, and client relationship management. Proficient in preparing detailed estimates and managing post-contract cost control activities while supporting value engineering initiatives.
Highest-signal resume keywords
Electrical EstimatingCost ManagementValue EngineeringMicrosoft Office ProficiencyClient Relationship Management
ATS Keywords
Tailor your resumeApplicant Tracking System Keywords
Tip: use these terms in your resume and cover letter to boost ATS matches.
Hard Skills
Electrical EstimatingCost ManagementQuantity SurveyingChange ManagementCost Variance AnalysisConceptual EstimatingDetailed EstimatingMedium-Voltage SystemsLow-Voltage SystemsPower Distribution Infrastructure
Soft Skills
Excellent Communication SkillsOrganizational SkillsMentoring Skills
Tools & Technologies
Microsoft OfficeBluebeamAutoCADNavisworks
Certifications & Qualifications
CCPCEPCPEPQSMRICS
Industry Keywords
Data CenterMission-Critical FacilitiesIndustrial ProjectsConstruction ManagementProcurement Strategies
About the role
Key responsibilities & impact- Develop conceptual, schematic, design development, and detailed electrical cost estimates and cost plans
- Prepare and present estimate deliverables, cost reports, and commercial recommendations to clients and project teams
- Support feasibility studies, budgeting, cost benchmarking, and business case development for data center projects
- Review drawings, specifications, and vendor information to develop electrical estimates and quantity takeoffs
- Lead procurement activities, including bid package development, contractor prequalification, bid evaluations, leveling, and recommendations
- Review and validate subcontractor and vendor pricing for electrical systems and equipment
- Manage post-contract cost control activities, including change management, forecasting, and cost variance analysis
- Produce monthly cost reports and present findings to stakeholders and leadership teams
- Support value engineering initiatives and identify cost-saving opportunities while maintaining project objectives
- Collaborate with clients, designers, contractors, and supply chain partners throughout all project phases
- Mentor junior estimators and cost management professionals
- Support client relationship management and business development initiatives
- Adhere to applicable SOX control responsibilities
Requirements
What you’ll need- Must be physically based in the United States
- Must be legally authorized to work in the U.S.
- Strong technical experience across pre-contract, post-contract, and final account cost management
- Extensive electrical estimating experience for data centers, mission-critical facilities, advanced technology, industrial, or large-scale commercial projects
- Strong understanding of medium-voltage and low-voltage electrical systems, substations, switchgear, generators, UPS systems, transformers, busway, and power distribution infrastructure
- Experience preparing conceptual through detailed estimates for large and complex construction projects
- Strong knowledge of contractor means and methods, procurement strategies, and construction delivery models
- Ability to review drawings, specifications, and design documentation to identify scope and pricing risks
- Excellent presentation, verbal, written, and client-facing communication skills
- Proficiency with Microsoft Office, Bluebeam, AutoCAD, Navisworks, and related estimating software
- Strong organizational skills and ability to manage multiple priorities in a fast-paced environment
- Experience supporting value management, value engineering, and lifecycle costing initiatives
- Experience working directly with clients and contributing to business development efforts
- Significant experience in electrical estimating, cost management, quantity surveying, or preconstruction services
- Experience estimating large-scale electrical construction packages and critical power infrastructure required
- Bachelor's degree in Construction Management, Engineering, Quantity Surveying, or a related field preferred
- Data center, mission-critical, semiconductor, advanced manufacturing, or industrial project experience strongly preferred
- Professional certifications such as CCP, CEP, CPE, PQS, MRICS, or similar are a plus
Benefits
Comp & perks- Remote work permitted from within the United States
- Bonuses may be available
- Comprehensive benefits package
- Healthy, productive, and flexible working environment
- Work-life balance support
- Equal opportunity and inclusive workplace