Apply

Ready to go for it?

AI Apply speeds things up—apply directly if you prefer.

FREE ACCESS
5,000–10,000 jobs/day
Scoutfield Logo

See all jobs on Scoutfield

Search thousands of fresh jobs every day.

Discover
  • Fresh listings
  • Fast filters
  • No subscription required
Create a free account and start exploring right away.
Doxel

Construction Schedule Analyst

Doxel

. Visually analyze and label complex blueprint-style documentation and models of customer sites .

Posted 10/9/2026full-timeRemote • IndiaJuniorMid-LevelWebsite

Core Competencies

Role fit
Core Competencies

Use this summary to align your resume positioning with the role.

Demonstrates expertise in construction scheduling and project management, with a strong focus on analyzing project data and maintaining communication across teams. Proficient in using scheduling software to enhance project efficiency and deliver high-quality outputs.

Highest-signal resume keywords
Construction SchedulingPrimavera P6 Scheduling SoftwareProject ManagementData AnalysisStrong Communication Skills

ATS Keywords

Tailor your resume
Applicant Tracking System Keywords

Tip: use these terms in your resume and cover letter to boost ATS matches.

Hard Skills
Construction SchedulingProject EngineeringProject ControlsData AnalysisCost ManagementProject EstimatingZone PlanningDefect AnalysisCritical Path AnalysisFloat Analysis
Soft Skills
Strong Written CommunicationStrong Verbal CommunicationIndependent WorkPrioritizationClosure Driving
Tools & Technologies
Primavera P6SynchroSlackJiraZoom
Industry Keywords
Construction IndustryData Center ProjectsHospital ProjectsManufacturing ProjectsBiopharmaceutical Projects

About the role

Key responsibilities & impact
  • Visually analyze and label complex blueprint-style documentation and models of customer sites
  • Perform complex analysis of customer projects
  • Understand results of the Doxel engineering team’s analytics output
  • Compare analytics with construction industry standards
  • Analyze customer project schedules to classify activities for internal tracking operations, critical path, and float for system reporting
  • Create detailed zone plans matching schedule organization and coordinate with the VDC team for zone creation
  • Analyze and verify product data generated for customer reports from scan data compared to a 3D model using proprietary techniques
  • Maintain ongoing communication using Slack and Jira
  • Conduct direct phone calls and conference calls over Zoom
  • Deliver high-confidence QC outputs that reduce rework and prevent downstream issues
  • Produce specific, actionable defect notes
  • Provide accurate exhibits, slides, and summaries
  • Serve as an internal SME on schedule structure and sequencing

Requirements

What you’ll need
  • 2+ years experience in construction scheduling, project engineering, project controls, or field coordination
  • Bachelor degree or greater in Construction Management, Mechanical or Electrical Engineering, or related field; or equivalent field experience
  • Experience working on data center, hospital, complex manufacturing, biopharmaceutical, or similar projects
  • Experience with Primavera P6 scheduling software
  • Strong written and verbal communication skills
  • Ability to work independently, prioritize, and drive closure on open items
  • Must be fluent in English
  • 3+ years of experience in the construction industry creating and managing project budgets (preferred)
  • 3+ years of experience in project management in the construction industry (preferred)
  • Experience with Synchro scheduling software (preferred)
  • Experience with construction project estimating and cost management (preferred)
  • Bachelor’s degree in Computer Science or equivalent work experience (preferred)

Benefits

Comp & perks
  • Competitive Base Salary + Equity Package
  • Remote first culture (for most roles)
  • Comprehensive Health Insurance (Medical, Dental, Vision)
  • Home Office Stipend
  • Monthly allowance for cell phone and internet
  • Flexible PTO, generous company holiday policy, and unlimited sick days